SWSG Logo



GLAN USK PRIMARY SCHOOL


As part of our contract to design and build the sports surfaces for a new school in Newport we constructed a 2/3 Size All Weather Pitch together with a MUGA with a Polymeric Surface. Works to both included drainage, engineered base, insitu rubber shockpad, perimeter fencing, floodlighting, sand filled synthetic carpet, perimeter footpaths and goal posts. In addition we will be maintaining the pitches as part of an ongoing contract.

Whilst onsite we were also asked to create two new nursery areas finished with wetpour safety surfacing.


Site Address: Ysgol Glan Usk
Glebelands, Newport

Client: Norwest Holst Ltd
Mark Tregelles 07786 057466

Contract Value: 360,000
Construction duration: 26 weeks

Completion Date: Handover Sept 2009