Cwmbran High School, formerly Fairwater School, approached South Wales Sports Grounds (SWSG) in 2018 to design and build a new MUGA facility at the rear of the school to allow the children to utilise a surface for football, tennis, netball and basketball.  With a D&B proposal, SWSG were able to design a surface that allowed all the sporting needs to be satisfied with minimum disruption the schools timetable for construction.

A new rebound fence was constructed to surround the court with the tarmac surface receiving a colour coated surface to provide a more aesthetic finish as well as superior grip and playability. The colour coating was matched to the school’s colours with line marking to suit. SWSG also supplied the sports equipment including basketball, tennis and netball nets.

  • Site Address

    Cwmbran High School,
    Ty Gwyn Way,
    Cwmbran
    NP44 4YZ.

    Client

    Andrew Harrison BSc(Hons), AaPS, NRAC Consultant
    PROPERTY OFFICER – PROPERTY & HIGHWAY ENGINEERING
    Torfaen County Borough Council

    Contract Value

    £80,000

    Construction Duration

    10 weeks

    Completion Date

    September 2017

  • Facility Details

    Tarmac Multi Use Games Area

    3m Fence Surround

    Line marking and colour coating

In conjunction with Bouygues UK, South Wales Sports Grounds (SWSG) constructed a new football and hockey 3G surface as well as a macadam bank of tennis, basketball and netball courts at the extiting school site at Llantwit Major Comprehensive School. The 3G surface was topped with sand and rubber crumb with the MUGA finished with a sports colour coating paint for improved grip and surface longevity.

SWSG and its subcontractors were involved in all aspects of the construction including flootlights & electrical, drainage, subbase, stone and tarmacadam providing designs and information during pre-construction and carrying on with maintenance after the surfaces’ completion.

  • Site Address

    Ham Ln E,
    East Llantwit Major
    CF61 1TQ

    Client

    Mike Baynham – Bouygues Projects Director

    Contract Value

    £550,000

    Construction Duration

    16 weeks

    Completion Date

    October 2017

  • Facility Details

    FIFA Quality & FIH Accredited 3G
    Multi Use Games Area
    Polymeric Long & Triple Jump Run up and pit.