Working on behalf of GeoTurf Consulting, South Wales Sports Grounds (SWSG) renovated and reinstalled the Welsh Premier league sides main pitch providing a natural and in-keeping surface for the club and community. Over and above the main grass pitch works a new boundary fence and perimeter concreting works brought the pitch to the leagues new standards and gave better facility to players, coaches and the public.

Despite a particularly dry summer in 2018, SWSG’s installed and operated temporary irrigation system enabled the surface to be grown and established in time for the start of the season.

  • Site Address

    The Ramp,
    Undy,
    Caldicot
    NP26 3EW

    Client

    Jonathon Smith – GEO Turf Constulating Limited

    Contract Value

    £70,000

    Construction Duration

    9 weeks.

    Completion Date

    August 2018

  • Facility Details

    Natural grass pitch for Welsh League Football
    Fence surround
    Temporary irrigation systems

On Behalf of Caerphilly County Borough Council, South Wales Sports Grounds (SWSG) were commissioned to install a new Third Generation synthetic surface for use by Blackwood Comprehensive School and the surrounding area. The project involved the removal of the old existing ATP surface, drainage system and floodlighting columns in exchange for a larger World Rugby compliant all-weather pitch.
The plateau required a considerable cut and fill process as well as new connections and accessways to suit the new footprint. In addition to a newly installed 8m High Fence / net configuration the surface was installed with a new floodlighting system, dynamic stone base, synthetic shockpad and a surface line-marked for rugby, football and small sided football. Works were completed and managed by SWSG in-house personnel throughout

  • Site Address

    Blackwood Comprehensive School,
    Ty-Isha Terrace,
    Blackwood
    NP12 1ER.

    Client

    Huw John – Caerphilly County Borough Council

    Contract Value

    £350,000

    Construction Duration

    20 weeks.

    Completion Date

    Summer 2018

  • Facility Details

    FIFA and World Rugby Accredited 3G Surface
    5m and 8m Surrounding Fence
    High Ball stop netting
    Equipment for Rugby and Football
    8 column Floodlighting system.