The Fitzalan High School project in Leckwith, Cardiff represented one of the largest in the company’s history. A project encompassing a multitude of surface types and construction methods the Fitzalan project showcased the variety and depth of knowledge we could carry out.

This development, on behalf of Kiers, included the construction of a Tier 1 hybrid surface, 3G FIFA Quality football pitch, 3G World Rugby pitch, 2G sand filled Multi Use Games Areas, full-size natural grass pitch and IAAF hammer throw cage and landing area. The project also includes the future construction of an FIH standard hockey surface, tarmac tennis courts and additional natural grass facilities all to be completed within the next year.

For all 7 pitches constructed we built bespoke drainage systems, perimeter fencing, tarmac paths, sports equipment, team shelters and floodlighting as well as the being the installers of the irrigation systems on the hybrid pitch and grandstand bases on the World Rugby 3G.

Alongside groundworks and landscaping contractors South Wales Sports Grounds managed pitch construction throughout the winter months for a phase 1 package completion in the summer of 2021 and handover to the client for use during the during construction of the new school.

The site is situated in a hub of sporting excellence in Leckwith, Cardiff, alongside Cardiff’s International Athletics Track which South Wales Sports Grounds redeveloped in 2019 as well as being alongside the existing Canton 3G and grass fields we constructed in 2016-2017 and Gol Centre Cardiff 5-a-side pitches, we resurfaced in 2020.

Your teams’ collaboration, coordination and understanding of our requirements have been excellent. Nothing seems to be too much trouble and your team are truly client focused. The collaborative approach has been very refreshing especially with our programme issues in respect to delays to various pitches.
Please on behalf of myself and the Kier Team thank your team for their efforts so far. May it long continue.”

Andy Miles – Keir

  • Site Address

    Fitzalan High School
    Lawrenny Ave,
    Cardiff,
    CF11 8XB

    Client

    Andrew Miles – Keir

    Contract Value

    £3.35 Million

    Construction Duration

    12 Months

    Completion Date

    August 2021

  • Facility Details

    Full Size SISGrass Hybrid Football Pitch
    FIFA and World Rugby Accredited 3G Surfaces
    Fullsize natural soil football pitch
    Large natural grass throwing areas
    Sanddressed MUGAs


The playing surface at Fairwood training academy was constructed using a SIS stitched hybrid system utilising polyethylene monofilament dual tone colour filament and natural grass combination. The surface works were constructed on a new rootzone, sand and sacrificial and grit stone base.

Together with an 8-year warranty, SIS Grass and South Wales Sports Grounds supplied a world class state of the art surface, irrigation and drainage system as well as some ancillary fencing, pathway and edge constructions.  South Wales Sports Grounds were responsible for all aspects of the construction build‐up with SIS Pitches completing the final stitching of the hybrid surface.

“In the summer of 2017 South Wales Sports Grounds together with SIS grass constructed 3 new, state of the art hybrid pitch at our first team training facilities at Fairwood. The work was completed to a very high standard and within the tight time frame.  Site safety was ably considered and SWSG managed aspects of the build and aftercare well. The team worked with politeness and professionalism throughout and contributed to a World class end product.

We’ve used SWSG for all our renovations and new build projects over the last four years and I would thoroughly recommend their services for any future endeavours”.

Rhidian Stephens

Swansea City A.F.C. Project Manager

  • Site Address

    Fairwood Training Grounds,
    Upper Killay,
    Swansea
    SA2 7JX

    Contact

    Rhidian Stephens
    Swansea City A.F.C. Project Manager

    Construction Duration

    10 Weeks

    Completion Date

    July 2017

  • Facility Details

    SIS Hybrid state of the art stitched surface
    Combination of Natural and Artificial

Alongside the construction of a World Rugby and FIFA compliant 3G surface South Wales Sports Grounds (SWSG) werecommissioned to build a 400m 6 lane athletics track on the existing redgra area of Bryn Celynnog Comprehensive. The athletics track, built to encompass the newly installed 3G, will provide a training and competition surface for the school as well as the local community. Built with the subcontractor Polytan the surface also has the Polytan SmarTrack system enabling real-time timing and tracking using magnets laid beneath the surface. Users of the track can utilise this technology through an app on their phones to track their performance.

The athletics facility is built to the highest and latest technology in athletics surfaces and provides a fantastic asset to any school’s sportsday.

“The schools are delighted with their new sports facilities finished to an excellent standard and the care taken throughout the works to minimize any disruption to the school’s day to day running and at the same time ensuring the safety of the pupils. I would certainly recommend SWSG as a contractor on future projects”.

Adrian Watkins – Design Project Manager, RCTCBC.

  • Site Address

    Bryn Celynnog Comprehensive,
    Penycoedcae Rd,
    Beddau,
    Pontypridd
    CF38 2AE

    Contact

    Adrian Watkins – Rhondda Cynon Taff

    Contract Value

    £800k

    Construction Duration

    20 weeks

    Completion Date

    August 2019

  • Facility Details

    FIFA and World Rugby Accredited 3G Surface

    Large natural grass throwing areas

    Full-size 400m 5 Lane running track.

    Polytan smart track system.

In spring 2018, South Wales Sports Grounds constructed a new sand dressed synthetic surface specifically for the all-girls school’s hockey team at Howells School at Llandaff, Cardiff.  The project involved the removal of the exiting grass surface, installation of a new stone raft, fencing, hydraulic “raise and lower” floodlights and ancillary footpath works. The works took place alongside the construction of a 2 bank MUGA and grass pitch.

The surface was handed over in July 2018 and enabled the school and community to utilise the hockey, small sided football and tennis markings.

The project worked in tandem with Notts Sports and was worked and managed throughout by SWSG’s in house teams.

  • Site Address

    Howells School,
    Cardiff
    CF5 2YD

    Client

    Duncan Bennett – Notts Sports Managing Director

    Contract Value

    £200,000

    Construction Duration

    20 weeks.

    Completion Date

    July 2018

  • Facility Details

    2G FIH accredited hockey surface
    4 Court Multi Use Games Area
    Type 4 Natural Grass Pitch

Working on behalf of GeoTurf Consulting, South Wales Sports Grounds (SWSG) renovated and reinstalled the Welsh Premier league sides main pitch providing a natural and in-keeping surface for the club and community. Over and above the main grass pitch works a new boundary fence and perimeter concreting works brought the pitch to the leagues new standards and gave better facility to players, coaches and the public.

Despite a particularly dry summer in 2018, SWSG’s installed and operated temporary irrigation system enabled the surface to be grown and established in time for the start of the season.

  • Site Address

    The Ramp,
    Undy,
    Caldicot
    NP26 3EW

    Client

    Jonathon Smith – GEO Turf Constulating Limited

    Contract Value

    £70,000

    Construction Duration

    9 weeks.

    Completion Date

    August 2018

  • Facility Details

    Natural grass pitch for Welsh League Football
    Fence surround
    Temporary irrigation systems

The project in Eastern High, Cardiff was a multi construct project with the installation of a full-size FIFA and World Rugby quality 3G surface, 2 large-scale tarmac multi-use-games-areas and a natural grass surface. The project was completed with the main contractor, Willmott Dixon.

The natural surface was built alongside the other facilities and provided a playing surface for the needs of the school’s rugby, football, hockey teams and many more.

The grass pitch was built as a Sport England Type 4 grass surface and therefore has both primary and secondary drainage, pitch dressing sand and grass seed & fertilizer.

  • Site Address

    Trowbridge Rd,
    Rumney,
    Cardiff
    CF3 1XZ

    Client

    Jarred Owen – Senior Building Manager Willmott Dixon

    Contract Value

    £1.1 Million

    Construction Duration

    34 weeks

    Completion Date

    March 2017

  • Facility Details

    Type 4 Natural Grass Pitch
    Fullsize FIFA and World Rugby Accredited 3G Surface
    6 Court MUGAs for Tennis / Netball / Basketball and Football