Official partner of the FAW

Bryn Celynnog Comprehensive School

Client
Adrian Watkins – Rhondda Cynon Taff
Location
Bryn Celynnog Comprehensive,
Penycoedcae Road,
Beddau,
Pontypridd
CF38 2AE
Value
£800,000
Duration
20 Weeks
Date
August 2019
Facilities
FIFA & World Rugby Accredited 3G Surface
Large Natural Grass Throwing Areas
Full-size 400m 5 Lane Running Track
Polytan Smart Track System

Alongside the construction of a World Rugby and FIFA compliant 3G surface South Wales Sports Grounds (SWSG) werecommissioned to build a 400m 6 lane athletics track on the existing redgra area of Bryn Celynnog Comprehensive.

The athletics track, built to encompass the newly installed 3G, will provide a training and competition surface for the school as well as the local community. Built with the subcontractor Polytan the surface also has the Polytan SmarTrack system enabling real-time timing and tracking using magnets laid beneath the surface. Users of the track can utilise this technology through an app on their phones to track their performance.

The athletics facility is built to the highest and latest technology in athletics surfaces and provides a fantastic asset to any school’s sportsday.

“The schools are delighted with their new sports facilities finished to an excellent standard and the care taken throughout the works to minimize any disruption to the school’s day to day running and at the same time ensuring the safety of the pupils. I would certainly recommend SWSG as a contractor on future projects”.

Adrian Watkins

Design Project Manager, RCTCBC