Official partner of the FAW

Fitzalan High School

Client
Andrew Miles – Keir
Location
Fitzalan High School
Lawrenny Avenue,
Cardiff
CF11 8XB
Value
£3.35 Million
Duration
12 Months
Date
August 2021
Facilities
Full-size SIS Grass Hybrid Football Pitch
FIFA & World Rugby Accredited 3G Surfaces
Full-size Natural Soil Football Pitch
Large Natural Grass Throwing Areas
Sand Dressed MUGA’s

The Fitzalan High School project in Leckwith, Cardiff represented one of the largest in the company’s history. A project encompassing a multitude of surface types and construction methods the Fitzalan project showcased the variety and depth of knowledge we could carry out.

This development, on behalf of Kiers, included the construction of a Tier 1 hybrid surface, 3G FIFA Quality football pitch, 3G World Rugby pitch, 2G sand filled Multi Use Games Areas, full-size natural grass pitch and IAAF hammer throw cage and landing area. The project also includes the future construction of an FIH standard hockey surface, tarmac tennis courts and additional natural grass facilities all to be completed within the next year.

For all 7 pitches constructed we built bespoke drainage systems, perimeter fencing, tarmac paths, sports equipment, team shelters and floodlighting as well as the being the installers of the irrigation systems on the hybrid pitch and grandstand bases on the World Rugby 3G.

Alongside groundworks and landscaping contractors South Wales Sports Grounds managed pitch construction throughout the winter months for a phase 1 package completion in the summer of 2021 and handover to the client for use during the during construction of the new school.

The site is situated in a hub of sporting excellence in Leckwith, Cardiff, alongside Cardiff’s International Athletics Track which South Wales Sports Grounds redeveloped in 2019 as well as being alongside the existing Canton 3G and grass fields we constructed in 2016-2017 and Gol Centre Cardiff 5-a-side pitches, we resurfaced in 2020.

“Your teams’ collaboration, coordination and understanding of our requirements have been excellent. Nothing seems to be too much trouble and your team are truly client focused. The collaborative approach has been very refreshing especially with our programme issues in respect to delays to various pitches.
Please on behalf of myself and the Kier Team thank your team for their efforts so far. May it long continue.”

Andy Miles

Keir